Contrast and Analysis on Hydraulic Characteristics of Gongboxia Horizontal Gyrating Discharge Tunnel

来源 :35th IAHR World Congress(第三十五届国际水利学大会) | 被引量 : 0次 | 上传用户:qisucha
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The horizontal gyrating discharge tunnel is one of the most efficient internal dissipation technology from the view point of ecological environment and economic benefit.
其他文献
The main features in the aspect of flood discharge of those large water resources and hydropower projects located in narrow valleys in China are high head,large flow rate and strong discharge power, a
With the increase in the size and capacity of hydropower unit, operation stability of hydropower station becomes more and more important.The brief introduction is made for "theory of cavitation cavity
The effect of a surge control structure in lowering the maximum transient pressures for a once-through cooling water piping system is determined through numerical simulation with a maximum and minimum
In dam-break flow experiments, the instantaneous dam-break is usually modeled by a moving gate whose removal time has to be small enough to not disturb significantly the flow in the initial instants.
The scour process created by the impingement of high-velocity water jets on fissured rock is the result of complex physical phenomena.
Hydropower development is driven globally by an increased emphasis on the development of renewable energy resources.An increased concern for the environmental impacts has led to an increasing number o
I(li)su Dam and Hydroelectric Power Plant (HEPP) are under construction on the Tigris River on the south east of the Turkey.During the construction stage, Tigris River has been diverted by 3 concrete-
The surge tank located at the upstream head of penstocks and shafts of hydropower plants is an effective measure to protect the headrace tunnels against high pressure fluctuations.It reflects the tran
The original approach named "mathematical test bend" is considered for the modeling the operations of various hydraulic devices (such as valves, regulators, etc.) being included in the complex pipe sy
The conventional quality inspection method of concrete face rockfill dam (CFRD) compaction primarily relies on sampling randomly at job-site spots after compaction, which may cause unreliable represen