论文部分内容阅读
缺少石料的平原地区,用丙纶组织袋充填滩涂淤泥堆筑海堤,能显著降低工程造价。本文对施工过程中,受涨落潮作用(堤顶溢流)情况下堤中充泥编织袋的水力稳定问题进行了研究。通过理论分析和试验,给出了计算式。可供有关设计施工部门参考。
Lack of stone in the plains area, with polypropylene bags filled beach mud silted seawall construction, can significantly reduce the project cost. In this paper, the hydraulic stability problem of filled clay bags in dike under the condition of tidal current and flood (embankment overflow) is studied in the process of construction. Through theoretical analysis and experiment, the formula is given. For design and construction department for reference.