水利水电工程施工担保分投标担保、履约担保、预付款担保三个步骤;担保的方式主要有保证和定金两种形式。这些担保形式各有利弊。为此业主审核承包商提交的担保过程中,应注意对中标人未签订合同并按要求提供履约担保前,不能退还投标担保;不可以用履约担保替代预付款担保;认真审查担保书的有效性、真实性和担保资格的有效性。
Construction of water conservancy and hydropower project sub-bid guarantee, performance guarantee, prepayment guarantee three steps; guarantee the main ways to guarantee and deposit in two forms. These forms of guarantee have their own advantages and disadvantages. To this end, the owner of the contractor to review the process of security, should pay attention to the successful bidder did not sign the contract and provide the required performance guarantee before the contract can not be returned to the tender guarantee; can not use the performance guarantee alternative to prepayment guarantee; carefully examine the validity of the bond , Authenticity and validity of warranty.