武汉绿地新都会项目为绿地控股集团在武汉开发的第一个住宅项目,位于武汉市汉阳区江城大道与四新南路交汇处。该项目场地土质情况较差,不同的基础形式对其造价产生较大影响。本文以该项目D地块别墅区复合地基基础为例,通过该复合地基与预应力管桩在经济性、施工进度等方面的对比分析,为复合地基在深厚软土地区的应用提供依据。
Wuhan Greenland Metropolitan Project is the first residential project developed by Greenland Holding Group in Wuhan and is located at the intersection of Jiangcheng Avenue and Si Xin Nan Road, Hanyang District, Wuhan. The project site soil quality is poor, different basic forms have a greater impact on their cost. In this paper, the project of D complex villa area of composite foundation as an example, through the composite foundation and prestressed pipe pile in the economy, construction schedule and other aspects of comparative analysis for the composite foundation in the deep soft soil areas provide the basis.