This paper investigates the twin automated stacking crane(ASC)scheduling problem,considering the capacity constraint of the buffer space,at an automated container terminal.
Composite foundation is often utilized to reduce the post-construction settlement of high speed railway embankments constructed on the soft soil.Due to the uncertainties in the properties of the soft