Ex-Post Evaluation of Active Traffic Measurement on Freeway-Peak Hour Lane

来源 :2015年南京第十四届亚太智能交通论坛 | 被引量 : 0次 | 上传用户:yjtgu618215
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Continued increase in traffic congestion has been an important barrier for individuals travel quality and socioeconomic development.Since the density of road network is already concentrated in some area, which means the traditional measures, such as road construction, may no longer acceptable.Active traffic management (ATM) is considered as the new dynamic traffic control and management strategy to combat traffic congestions which includes peak hour lane,adaptive signal control, speed harmonization and so on.Peak hour lane is widely applied on Dutch freeway in order to reduce traffic congestion during the peak hour.The effect of this measurement is evaluated by real traffic data.The nearest-neighbor method is adopted to deal with the missing data.The positive and negative aspect of peak hour lane are investigated from the experiments.The capacity for the 2-lane freeway will increase when the hard shoulder is used as an additional lane.The speed and travel time also can be influenced by the release of the peak hour lane.
其他文献
结合一波形钢腹板PC组合箱梁桥具体工程,采用ANSYS通用有限元程序建立了其板壳实体有限元模型,详细模拟了组合梁各部分结构.计算分析了梯度温度效应下组合梁的受力,分析了不
根据DAlembert原理和Euler-Bernoulli梁的假设,在考虑桥面不平顺、车轮和路面相互作用位置不脱离的条件下,建立了连续波纹钢腹板箱梁在多个车辆荷载作用下的振动耦合方程.采
  In order to improve the reliability of the microwave vehicle detection technology, we develop linear frequency modulated continuous wave (FMCW) radar to pro
文中简述了波折钢腹板组合梁桥建设现状,分析了传统桥梁分析方法的不足及在分析波折钢腹板组合梁的缺陷,从而引出空间网格分析方法,并对其原理进行简述.通过分析波折钢腹板刚
为将日月潭打造成为「低碳观光、智慧旅游」的示范旅游地点,让游客感受到创新(innovative)、智慧(intelligent)与有趣(interesting)i3Travel的全新体验,提升日月潭观光特色同
  Following the background of transportation network, this paper considers a transportation network flow problem on the long term (strategic) planning level.S
  In this work, we present recent advances on the creation of data-driven models to address the needs of transportation planners during the conception, unders
  The real-time location information of personal, machine, material is the key element of the information management of highway tunnel construction.It can be
考虑传统大量布设固定式车辆侦测器之方式,其建置及维护更新成本庞大,为利公部门投入资源发挥最大效益,期以既有智能型运输系统建置成果为基础,导入多元交通信息侦测与数据融
  The primary objective of this study is to develop a coordinated control strategy that combines Ramp Metering (RM) and Variable Speed Limit (VSL) to reduce s