论文部分内容阅读
针对桃园煤矿大倾角综采工作面调向回采所遇到的问题,提出预防和处理措施,确保了调向回采期间的安全回采,提高了资源回收率。
Aiming at the problems encountered in the reclamation of the fully mechanized coal mining face with high inclined angle in Taoyuan Coal Mine, preventive measures and treatment measures are put forward to ensure the safe recovery during the transfer to the mining and improve the resource recovery rate.