论文部分内容阅读
近年,随着国家经济的发展,市场对资源、电力的需求不断扩大,此类建设生产项目不断上马。这类项目运行周期长,且在运行期内,存在开挖地表、取土、弃渣等生产活动,项目占地面积不断变化,扰动土地破坏植被面积不断增加,其水土方案编制与建设类项目区别很大。因此,在编报方案时应本着具体情况具体分析,使水保方案更具可操作性。
In recent years, with the development of the national economy, the market has continuously expanded the demand for resources and electricity, and such construction and production projects have been launched. Such projects have a long operation cycle, and during the operation period there are production activities such as excavation of earth surface, earth borrowing and spoil disposal. The project covers an area of 60,000 square meters and the area of disturbed land is increasing constantly. The project of soil and water conservation and construction A big difference. Therefore, in the preparation of the program, we should make concrete analysis according to the specific situations so as to make the program more feasible.