宝钢炼铁厂在1号高炉体风定修期间(24h)进行了大规模余热回收工程的改造,没有影响正常生产,这在国内尚属首创。该工程试运转一个月后于1990年11月23日正式投产。该余热回收装置包括烟气换热系统、空气换热系统、煤气换热系统和热媒水压送系统。该装置可充分利用热风炉烟道烟气中的大量热量,改善热风炉燃烧工况,降低焦炉煤气消耗量,每天可节约焦炉煤气12.48万m~3,相当于每年减少1.74万吨重油消耗量,改造工程所用
Baosteel Iron & Steel Works in the No. 1 blast furnace breeze repair (24h) carried out large-scale waste heat recovery project transformation, did not affect the normal production, which is still the first in China. The project commissioning a month later on November 23, 1990 formally put into operation. The waste heat recovery device comprises a flue gas heat exchange system, an air heat exchange system, a gas heat exchange system and a heat medium water pressure delivery system. The device can make full use of the large amount of heat in the flue gas of the hot blast stove, improve the combustion condition of the hot blast stove and reduce the gas consumption of the coke oven, and can save 124,800 m 3 of coke oven gas per day, equivalent to an annual reduction of 17,400 tons of heavy oil Consumption, renovation project used