论文部分内容阅读
以广州市南沙区某工程项目为背景,研究了构件安装时水平度和垂直度控制的施工工艺,并对构件接缝处的防水构造和构件吊装时的安全技术措施进行了研究和总结,可为类似工程的装配式施工提供参考和借鉴。
Based on a project in Nansha District of Guangzhou City, the construction technology of level control and verticality control during component installation was researched. The waterproof structure at the joint seams and the safety technical measures during hoisting of components were studied and summarized. Provide a reference and reference for assembly-type construction of similar projects.