【摘 要】
:
1运行维护根据2015年重水研究堆(以下简称101堆)检修计划完成以下内容:检查维护重水储存间风机和重水渗漏监督系统;维护201房间供电屏(交流380/220 V、应急电源、交流48V、直
论文部分内容阅读
1运行维护根据2015年重水研究堆(以下简称101堆)检修计划完成以下内容:检查维护重水储存间风机和重水渗漏监督系统;维护201房间供电屏(交流380/220 V、应急电源、交流48V、直流48V)、重水泵控制屏、54Б控制屏、新通风中心控制屏;检查、维护重水系统管路、阀门;维护剂量泵甲、乙和相关管道、阀门;维护1、2、3号真空泵;维
1 Operation and Maintenance According to the 2015 Heavy Water Research Reactor (hereinafter referred to as the 101 pile) overhaul plan, the following contents shall be completed: Inspection and maintenance of fans and heavy water leakage monitoring systems for heavy water storage rooms; maintenance of 201 room power supply panels (AC 380/220 V, emergency power supply, 48V, DC 48V), heavy water pump control panel, 54Б control panel, new ventilation center control panel; inspection and maintenance of heavy water system piping, valves; maintenance of the dose pump A, B and related pipes, valves; Vacuum pump; dimensional
其他文献
The study established the distribution coefficient database of HNO3,U(Ⅵ),U(Ⅳ),Pu(Ⅲ),Pu(Ⅵ),Np(Ⅳ),Np(Ⅴ),Np(Ⅵ),Tc,Zr,Ru and HNO2.Based on the distribution c
1反应堆运行生产情况运行人员:现有值班长9人,操纵员2人;新晋升值班长1人,新晋升操纵员0人;学习的值班长3人,学习的操纵员0人;调出值班长1人;调出操纵员0人。运行情况:开堆2
我国在建的高温气冷堆核电站示范工程(HTR-PM)具有第四代反应堆特征,无论从反应堆结构还是放射性废物产生,它都与现役的核电站反应堆有较大差异。HTR-PM正常运行期间的固体废
大学生是国家的未来和希望,他们正处于全面发展的关键阶段,但是目前我国大学生的身体和心理健康状况不容乐观。随着网络的多元化、网络社会和网络游戏等活动的盛行,使得部分
周末下午,我来到小公园的空地上。很早就想学习传统武术,一直借口工作忙没时间。最近用一款APP约到一位武术世锦赛冠军。一小时过去,累得汗流浃背,不过我觉得收获颇丰。相比
本项目于2011年度正式批复,2015年为放射性废液暂存库贮存废液处理运行的第4年,根据计划全部完成项目的废液处理内容并进行财务决算和审计工作。本年度主要的运行任务包括水
2012年国际原子能机构(IAEA)发布了第SSG-23号特定安全导则《放射性废物处置安全全过程系统分析和安全评价》,为评价和论证所有类型放射性废物处置设施的安全提供指导。经济
核燃料后处理放化试验设施(CRARL)热室线运输机连接01-08B热室与54B进料手套箱,它的正常运行保证了非放物料转入01-08B热室以及物料在各热室间转运。CRARL热室线运输机轨道总
DMHAN and MMH were selected as the reduntants in APOR process,and the radiolysis behavior of reductants was important for its application.The analysis method of
利用建立的井型NaI(T1)γ谱仪进行了~(125)I放射性活度的绝对测量,~(125)I放射源由同一批放射性溶液制备,活度范围为10~2~10~4Bq。通过不同强度源的活度测量,得到了~(125)I活