一、武钢高炉炉身结构的变化目前,高炉炉身寿命特别是炉身下部及炉腰,已经成为大型高炉能否长期维持稳产高产的关键。在武钢,1970年之前各高炉基本上是按苏联五十年代的设计建造的。1970年以后,几座高炉利用大修或中修机会进行了结构改造。具体来说,武钢高炉炉身结构采用过以下几种类型。 1.于1958年首先建成投产1965年中修的一号高炉,采用了如图1右边所示的第一种结构。二、三号高炉建设也相继采用过这种设计。它的特点是:炉腰托圈以上设四层扁水箱,其上(炉身下部)为八层(二高炉大修
First, changes in the structure of the furnace body of blast furnace in WISCO At present, the life of the blast furnace shaft, especially the lower part of the shaft and the waist, has become the key to the long-term maintenance of large-scale blast furnace in stable and high yield. In WISCO, the blast furnaces were basically built according to the design of the Soviet Union in the 1970s until 1970. After 1970, several blast furnaces used the overhaul or repair opportunities for structural transformation. Specifically, WISCO blast furnace shaft structure used the following types. 1. The first blast furnace built and put into operation in 1965 in 1958 was first constructed as shown on the right of Figure 1. Second, the third blast furnace construction have also adopted this design. Its features are: above the waist ring set four flat water tank, which (lower body) for eight (two blast furnace overhaul