CRTSⅡ型无砟轨道补偿板生产技术

来源 :铁道建筑技术 | 被引量 : 0次 | 上传用户:tang355402
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
CRTSⅡ型轨道板制造为板式无砟轨道施工技术中的关键技术之一,分为标准轨道板、特殊板和补偿板制造。由于每条铁路线上用到的补偿板的数量少,制作工艺复杂,所以对补偿板很少有单独的论述,但补偿板制造是CRTSⅡ型板式无砟轨道施工过程中不可缺少的关键技术。补偿板的外型尺寸基本同标准轨道板,但它的长度较标准轨道板短,因此用到的钢筋长度、混凝土量、预埋套管与标准轨道板相比都少。补偿板与标准轨道板相比,最大的区别在于采用了单向的单根预应力钢筋张拉法和预埋套筒式的起吊方式。 One of the key technologies in the construction of slab ballastless track is the manufacture of CRTS Ⅱ track slab. It is divided into standard track slabs, special slabs and compensation plates. Because of the small number of compensation plates used in each railway line and the complicated manufacturing process, there is seldom discussion on the compensation plates. However, the manufacture of compensation plates is an indispensable key technology in the construction of CRTS Ⅱ slab ballastless track. The size of the compensating plate is basically the same as that of the standard track plate, but its length is shorter than that of the standard track plate. Therefore, the length of the reinforcing bar, the amount of concrete used and the buried sleeve are less than those of the standard track plate. The biggest difference between the compensation plate and the standard track plate is that the unidirectional single prestressed steel tensioning method and the embedded sleeve lifting method are adopted.
其他文献
对江苏省高职院校图书馆新生教育的方式、内容、后续教育措施等现状进行了调研,分析了目前存在的问题,从图书馆新生教育的定位、方式等方面,提出完善与改进江苏省高职院校图
通过采用等压变温硫化工艺:在硫化过程通热水并短时间循环后,保持过热水压力、停止热水循环并持续到硫化结束,可缩短过热水的循环时间、节约过热水及循环所需能量、降低生产能
简述了泛在知识环境的涵义及特征,分析了泛在环境下大学生的信息需求及行为变化,提出只有不断改革教育方式才能提高学生的信息素养,提高他们的创新能力和利用信息检索解决问
分析了地铁明挖区间与车站围护结构设计的不同之处,采用分段设计、施作日字型环框梁、优化支撑布置的方式,左右线箱体间设置板撑和中隔墙后做等方式,优化了明挖区间围护结构
以研究内蒙古民营企业的人力资源管理情况为出发点,分别从人力资源战略规划、员工选拔与录用、培训与开发、薪酬与福利管理、绩效管理、员工激励等方面分析了内蒙古民营企业