1992年4月全国人大通过了兴建长江三峡工程的决议。三峡工程是中国目前规划中最大的水利工程,也是世界上最大的水利枢纽工程之一。具有防洪、发电、航运、养殖、供水等巨大的经济效益和社会效益。目前三峡工程建设已进入正式施工准备阶段。国务院三峡工程建设委员会第二次会议审查批准了《长江三峡水利枢纽初步设计报告(枢纽工程)》。根据这一报告,长江三峡工程建设将采用“明渠通航、三期导流”的施工方案;单机容量由68万千瓦增加到70万千瓦,装机总规模则由1768万千瓦增加到1820万千瓦.年平均发电量由840亿千瓦时,增加到847亿千瓦时;施工总工期和发电工期比可行性研究报告提前1年,总工期17年,首批发电工期为11年;枢纽工程概算控制在500.9亿元(按1993
In April 1992, the National People’s Congress passed the resolution on the construction of the Three Gorges Project in the Yangtze River. The Three Gorges Project is the largest water conservancy project currently planned in China and one of the largest water control projects in the world. With flood control, power generation, shipping, aquaculture, water and other huge economic and social benefits. At present, the construction of Three Gorges Project has entered the stage of formal construction preparation. The State Council Three Gorges Project Construction Committee at its second meeting reviewed and approved the “Preliminary Design Report of the Three Gorges Project (hub project).” According to this report, the construction of the Three Gorges Project will adopt a construction program of “Open Channel Navigation and Phase III Diversion”; the capacity of a single machine will increase from 680,000 kilowatts to 700,000 kilowatts; the total installed capacity will increase from 17,680,000 kilowatts to 18,200,000 kilowatts Kilowatts.Annual average generating capacity increased from 84 billion kwh to 84.7 billion kwh; total construction period and power generation construction period than the feasibility study report 1 year ahead, the total duration of 17 years, the first power generation period of 11 years; Control at 50.09 billion yuan (by 1993