论文部分内容阅读
三明钢铁厂15吨氧气顶吹转炉的煤气回收装置已于1979年4月投产,至今已安全运转3年了。
The gas recovery unit of the 15-ton oxygen top-blown converter at Sanming Iron and Steel Plant was put into operation in April 1979 and has been operating safely for three years.