清江隔河岩水电站,位于河床右岸,为岸坡引水式。电站建筑物由进水口塔体、压力引水隧洞、压力引水纲管,电站厂房等建筑物组成。电站计安装单机容量30 kW的水轮发电机4台,总装机容量120万kW。电站已全面施工,进水口塔体底板已近全面完成,4条各长444 m的引水隧洞,已打通1~#、3~#,2~#、4~#小导洞开挖正在进行。
Qingjiang Geheyan Hydropower Station, located on the right bank of the riverbed, is a slope diversion type. Power station buildings from the inlet tower, pressure diversion tunnel, pressure water guide tube, power plant buildings and other buildings. Power station installed single-capacity 30 kW turbine generator 4, with a total installed capacity of 1.2 million kW. The power station has been fully constructed. The inlet floor of the tower has been fully completed. Four diversion tunnels with a length of 444 m have been opened and 1 ~ #, 3 ~ #, 2 ~ # and 4 ~ # pilot tunnels under construction are in progress.