防洪整治工程施工质量与人民生命财产的安全息息相关,而防洪整治工程中堤身填筑过程的施工质量是决定本工程总体质量的重要因素。但是在实际施工过程中,施工单位在堤身填筑施工过程中的质量控制措施仍然具有一定的进步空间,本文以广州市流溪河防洪整治第七期工程(太平桥至竹园庄B、C段)堤身填筑施工过程为背景,从土料选择、基础处理、土料碾压等方面对堤身填筑施工过程中的质量控制措施进行了研究,从而为日后此类型工程的施工提供理论基础和实践指导。
Flood control works construction quality and people’s lives and property are closely related to the safety, and flood control renovation project embankment construction quality is the process of determining the overall quality of the project an important factor. However, in the actual construction process, the quality control measures of construction units in the course of embankment construction still have some room for improvement. This article takes Guangzhou Liuxihe Flood Control Project No.7 (Taipingqiao to Zhuyuanyuan B, C) embankment construction process as the background, from the choice of materials, basic treatment, soil compaction and other aspects of the embankment construction quality control measures were studied in order to the future construction of this type of project Provide theoretical basis and practical guidance.