论文部分内容阅读
河南省首座抽水蓄能电站于 2 0 0 1年 6月 6日开工兴建 .该电站位于南阳市南召县境内 ,由上水库、下水库和引水发电系统三部分组成 ,其中上水库库容为118.4万m3,下水库库容为 12 9万m3,上下水库相对落差为 50 0m .电站装机容量为 2× 60MW ,设计年发电量为 2 0 0 32万kW
The first pumped storage power station in Henan Province was started on June 6, 2001. The power station is located in Nanzhao County, Nanyang City and consists of three parts: the upper reservoir, the lower reservoir and the diversion system, of which the upper reservoir has a capacity of 1.184 million m3, the storage capacity of the lower reservoir is 1.29 million m3, and the relative drop between the upper and lower reservoirs is 500m. The installed capacity of the power station is 2 × 60MW and the designed annual power generation capacity is 200.23 million kW