论文部分内容阅读
“大跃进”时期,甘肃省集全省优势资源,兴办超级水利工程——引洮工程。在“左”倾指导方针下,引洮工程修建期间无偿调拨了大批劳动力和物资,工地上的干部也为维系这一红旗样板工程多次更新换代。国民经济在60年代初期遭遇严重困难,引洮工程被迫下马,甘肃省委随即在引洮工地上进行物资退赔和干部甄别复查的善后处理工作。本文从一个个案的角度,考察中共如何从上述经济和政治两方面实事求是地处理危机,以将“大跃进”时期“大办”基建工程所带来的损失降到最低。
“Great Leap Forward ” period, Gansu province set the province’s advantageous resources, set up super water conservancy project - cited 洮 project. Under the guiding principle of “leftist” guidance, a large amount of labor force and materials were transferred at no charge during the construction of the project. Cadres on the construction site also kept upgrading the model project of the red flag many times. After the national economy suffered serious difficulties in the early 1960s, the project was forced to be dismissed. The Gansu Provincial Party Committee immediately proceeded to the aftermath of the reimbursement of materials and the screening of cadres for inspection at the construction site. From a case perspective, this article examines how the CCP can handle the crisis from the above-mentioned economic and political conditions in a realistic and realistic manner so as to minimize the losses caused by the “Great Leap Forward” and “Great Office” infrastructure projects.