论文部分内容阅读
1施工前的准备工作1.1施工技术的准备项目部在熟悉施工图纸的基础上,对图纸中的问题进行汇总,由总工办组织项目部及营业部结合本公司的施工特点,提出具体的修正方案,报甲方及设计单位共同探讨,以达成一致,使得问题能够在进场施工前得到最大限度的解决。项目技术人员在工程部及总工办的指导下,结合工程项目特点,编制出施工组织设计,内容包括工程概况及施工特点,施工方案,施工进度计划,劳动力、材料及机具需要量计划,施工平面布署及项目管理人员职责分配等。公司在多年的施工过程中,总结出一套比较成熟的施工作业方法,并编制成作业指导书,供项目人员参考,从而大大提高了工作效率,也方便了对施工操作人员的培训。
1 Preparation Before Construction 1.1 Preparation for Construction Technology Project Department, familiar with the construction drawings, summarizes the problems in the drawings and proposes specific amendments based on the construction features of the Company and its project department and sales department. Proposals should be submitted to Party A and the design institute for discussion so as to reach an agreement so that the problems can be solved to the maximum extent before the construction of the site. Under the guidance of the engineering department and chief engineer, the project technicians have compiled the construction organization design according to the characteristics of the project, including the general situation of the project and the characteristics of the construction, the construction plan, the schedule of the construction, the labor force, the materials and the requirements plan of the machine, the construction Plane layout and project management responsibilities such as distribution. In the course of many years of construction, the company has summed up a set of relatively mature construction operation methods and compiled operation instructions for reference of project personnel, thereby greatly improving work efficiency and facilitating the training of construction operation personnel.