杨家岭非常溢洪道泄洪闸工程是河南省昭平台水库除险加固工程项目的重要组成部分,各类现浇砼工程量近5.8万 m~2,整个砼底板平面面积约2.00万 m~2。由于受工程进度的制约,底板砼浇筑的施工高峰时段正值6~8月份的盛夏时节,为满足工程进度和工程质量的要求,在底板砼浇筑施工中为取得较好的和易性,采用了具有较大流动性的塑性砼进行
The spillway sluice project of Yangjialing very spillway is an important part of the project of reinforcement and reinforcement of Zhaopingtai Reservoir in Henan Province. The quantity of all kinds of cast-in-place concrete works is nearly 58,000 m 2 and the plane area of the whole concrete floor is about 20,000 m 2. Due to the progress of construction constraints, the construction of the floor of the concrete pouring peak time coincided with 6 to August in the summer season, in order to meet the progress of the project and the quality of the project requirements in the floor pouring construction in order to achieve better workability, the use of With a larger flow of plastic concrete