白山水电站二期工程

来源 :水力发电 | 被引量 : 0次 | 上传用户:qqzlei
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
白山水电站位于吉林省桦甸县境内第二松花江上。该电站第一期工程施工即将结尾,三台30万千瓦水轮发电机组已分别于1983年12月、1984年6月和12月相继投入运行,对缓和东北电网电力长期紧张状况起到了重要作用。但由于东北电网缺电严重,特别是水电在系统中的比重下降(现占20%不到),电力系统调峰、调频及事故备用容量不足的问题仍十分突出,这样就经常迫使用火电来进行调峰、调频,经济 Baishan Hydropower Station is located in the second Songhua River in Huadian County, Jilin Province. The first phase of the power plant construction is coming to an end, three 300,000 kilowatts hydro-generating sets have been in December 1983, respectively, in June and December 1984 have been put into operation, to ease the Northeast power grid long-term tension has played an important role . However, due to the serious power shortage in the Northeast Power Grid, especially the decrease in the proportion of hydropower in the system (accounting for less than 20% now), the power system peak shaving, FM and accidental backup capacity are still not enough, which often forced the use of thermal power Peak, FM, economic
其他文献
Basement structures and basement interfaces are obtained by finite-difference and time-term methods using Pg-wave data from two deep seismic sounding (DSS) prof
利用第三阶段科学专家组技术试验(GSETT-3)前两年半的《复查事件公报》(REB)提供的数据库,从发表的由 f-k 和极化分析得到的慢度和方位角的信息中,我们编辑了基本台网中的台
东方电机参加了土耳其阿迪古泽电站两台31MW水电设备的投标。在与西德、法国、奥地利、捷克、罗马尼亚等10家公司的竞争中,以531.4万美元的总价名列第一,8月16日正式签订了
平面闸门的滚动式支承有滚柱和滚轮两种。目前我国采用滚柱式的(如履带门或称链轮门)较少,而采用滚轮式的较多。滚轮与闸门的连接是依靠轮轴,轮轴和轮子之间装有轴 Plane g
继威洛·克里克全碾压混凝土坝建成之后,美国又一座碾压混凝土坝——犹他州上斯蒂尔瓦特坝正在施工。该坝的设计和施工别具一格,因而受到人们的瞩目。美国犹他州上斯蒂尔瓦
目前,中小泵站机组的起动和运转均靠人工手动操作,站内值班人员一般需6~9人,且操作麻烦。无人操作的低电压排水泵站,当泵站需要排水时,事先发出排水警报信号,水泵自动开车排
浑河流域是官厅水库以上流域内八大产沙区之一。根据对浑河流域实际资料分析,引洪用沙不仅洗盐隔碱、肥田壮土,利用了流失土壤的养分,而且年平均减沙比大于减水比的1倍,个别
《水力发电》1982年第10期刊登了李真波同志“解决小坝设计低坝宽基问题的探讨”一文,为解决小坝设计中“低坝宽基”的不合理现象提出了有益的意见。由于研究、采用合理的设
学生自身兴趣以及学习能力的差异化使得学生的外语水平不同,而社会行业发展需求又对英语能力的要求有不同的体现。外语教学针对的是一个规模较大的群体,如何实现在保证个体的
苏联已开始设计位于西伯里亚的下通古斯卡河河口附近的图鲁汉斯克水电站,下通古斯卡河是叶尼塞河的最大支流。该电站计划装机2,000万千瓦,将为秋明地区油田和气田开发提供电