论文部分内容阅读
白山水电站位于吉林省桦甸县境内第二松花江上。该电站第一期工程施工即将结尾,三台30万千瓦水轮发电机组已分别于1983年12月、1984年6月和12月相继投入运行,对缓和东北电网电力长期紧张状况起到了重要作用。但由于东北电网缺电严重,特别是水电在系统中的比重下降(现占20%不到),电力系统调峰、调频及事故备用容量不足的问题仍十分突出,这样就经常迫使用火电来进行调峰、调频,经济
Baishan Hydropower Station is located in the second Songhua River in Huadian County, Jilin Province. The first phase of the power plant construction is coming to an end, three 300,000 kilowatts hydro-generating sets have been in December 1983, respectively, in June and December 1984 have been put into operation, to ease the Northeast power grid long-term tension has played an important role . However, due to the serious power shortage in the Northeast Power Grid, especially the decrease in the proportion of hydropower in the system (accounting for less than 20% now), the power system peak shaving, FM and accidental backup capacity are still not enough, which often forced the use of thermal power Peak, FM, economic