长江流域规划要点报告阶段工程地质勘测的程序

来源 :人民长江 | 被引量 : 0次 | 上传用户:starylove
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言水利工程地质勘测是为规划设计服务的,依据设计程序,一般分为规划(或技术经济报告)、初步设计、技术设计及施工等四个阶段,因此工程地质勘测工作亦应与这些不同的设计阶段相适应。流域规划阶段的基本任务和主要内容是: (一)研究与查明流域内的工程地质条件,就干支流选择适于布置水利枢纽的方案,并阐明其工程地质水文地质特性,从而作出评价。 (二)研究并查明流域内与所选纽枢方案相适应的水库。 I. Introduction Water conservancy project geological survey is for planning and design services, according to the design process, is generally divided into four stages of planning (or technical and economic reports), preliminary design, technical design and construction, engineering geological survey should also work with these Adapt to different design stages. The basic tasks and main contents of the river basin planning phase are as follows: (1) To study and identify the engineering geological conditions in the basin, to select suitable schemes for the construction of water conservancy projects in dry and affected areas, and to clarify the engineering geological hydrogeological characteristics so as to make evaluation. (Ii) To study and identify reservoirs within the catchment that are compatible with the selected Newzones program.
其他文献
好莱坞超级英雄电影曾经创造出很多经典之作,赢得票房、口碑的双丰收。但随着类似作品的大量涌现,超级英雄电影不可避免地走入了缺乏创新的窠臼。漫威公司此时异军突起,以深
“本想当片警,不想成了特情”。余罪说他自豪的事有两件,一件是有个好爸爸,另一件是,他爸怕他学坏,送他当了警察。最初,想当警员而考入警校的余罪只有一个很简单的理想:当一
一、概述水流挟沙能力的探求,对解决水利工程中的泥沙问题具有极重要的意义。为了研究黄河水流挟沙能力,验证国内外已有公式并控求适合于黄河的公式,为河道治理中有关冲刷淤
一、长江流域水产资源丰富, 生素条件优越解放几年来,广大渔民群众在党和人民政府的正确领导下积极努力的结果,使新中国水产事业的恢复和发展取得了光辉的成就,完全改变了旧
采用柠檬酸 -乙醇络合溶胶 -凝胶法合成了两个单一相钙钛矿型稀土复合氧化物 La-Co O3和 La Fe O3并对其进行了结构 ,电阻率 ,比表面积 ,表面氧特性和 CO氧化催化活性比较研
新城金矿自 1 980年投产以来 ,相继关闭了 -3 0~ -1 2 0m共 5个中段 ,该文介绍有关这几个中段的关闭情况及所积累的经验。 Since it was put into operation in 1980, the Xi
在英明领袖华主席、党中央率领我们向科学技术现代化进军的大好形势下,在全省科学工作会议的鼓午下,经省革命委员会批准,自十月二十二到二十六日,在杭州召开了浙江省水工建
中原油田勘探开发科学研究院软件所科研人员,在油气勘探开发科技攻关中获得可喜成果。目前,中原油田地震勘探目标越来越复杂,常规技术收效甚微。针对这种情况,中原油田先后引进了
宝鸡峡引渭灌区,分为塬上、塬下两个部分。塬上总干渠长170公里,下分东西干渠。东干渠长26.3公里,西干渠长18.5公里。塬下总干渠长17公里,下分南北干渠。南干渠长76公里,北