论文部分内容阅读
大坝病险调查应综合资料收集分析、钻探过程、压注水试验等成果,并相互验证,进行多方位的病险分析评价,使调查结果更全面、更有说服力。
The dam risk survey should integrate the results of data collection and analysis, drilling process and injection water injection test, verify each other and carry out multi-directional risk analysis and evaluation to make the survey more comprehensive and persuasive.