论文部分内容阅读
介绍云南某野外电力设施配套净水工程的工艺流程、设计参数和运行情况。该净水工程采用管道混合器加药/高效反应沉淀器/重力无阀过滤器/二氧化氯消毒工艺,出水水质达到《生活饮用水卫生标准》(GB 5749-2006)的要求。
Describe the technological process, design parameters and operating conditions of the water purification project of an outdoor power facility in Yunnan Province. The water purification project uses a pipeline mixer dosing / efficient reaction settler / gravity valveless filter / chlorine dioxide disinfection process, effluent quality to “drinking water health standards” (GB 5749-2006) requirements.