论文部分内容阅读
在建设西南铝加工厂的工程中,曾经遇到过好几处不同情况的滑坡现象,有的非常严重。由于对这种山坡病害缺乏认识,在挖堑切割斜坡、路基及土坝填土时所引起的滑坡问题,给施工带来了很多困难。为了控制这类危害,我们根据不同的滑坡和工程情
In the construction of the Southwest Aluminum Processing Plant, there have been several landslides in different situations, some of which are very serious. Due to the lack of understanding of this type of hill slope disease, landslide problems caused by digging cut slopes, roadbeds, and earth dam filling have caused many difficulties in construction. In order to control this type of hazard, we use different landslides and engineering