某火力发电厂工程是一个煤电一体化项目,为典型的坑口电厂,它的燃料主要使用电厂附近煤矿生产的原煤,电厂发电将直接向电网供电,该电厂将采用大容量空冷燃煤机组。笔者对该项目建成投产后可能产生的职业病危险因素进行了识别与分析,为建设单位在项目建成投产后有效控制职业病的
A thermal power plant project is a coal-electricity integration project. It is a typical pithead power plant. Its fuel mainly uses raw coal produced by coal mines near the power plant. The power plant power generation will directly supply power to the power grid. The power plant will use large-capacity air-cooled coal-fired units. The author identifies and analyzes the possible risk factors of occupational diseases after the project is completed and put into production, and effectively controls occupational diseases after the project is put into operation