味噌川坝于 1 993年 1 2月 1 0日开始初次蓄水 (试验蓄水 ) ,1 996年 8月 3日结束。在根据初次蓄水时坝体变化的观测数据确认坝体稳定性后 ,于 1 996年 1 2月 1日正式投入使用。在评价坝体监测中最为重要的渗流量时 ,为了消除降雨因素的影响 ,采用水箱模型法通过渗流量响应分析 ,求出实际渗流量 ,与根据渗流分析推算出的渗流量值作了比较。根据坝体变化的观测结果和分析结果 ,对初次蓄水时的坝体稳定性进行了考察 ,同时介绍第二期管理期中和期前的观测结果。
Miso Chuanba on January 1, 1993 January 10 initial water (test water), August 3, 1996 end. After the stability of the dam was confirmed on the basis of the observation data of the dam body changes during the initial impoundment, it was officially put into operation on January 1, 1996. When evaluating the most important seepage flow in dam monitoring, in order to eliminate the influence of rainfall factors, the actual seepage flow rate is calculated by the tank model method through the seepage flow response analysis, which is compared with the seepage flow rate calculated from the seepage analysis. According to the observation result and the analysis result of the change of the dam body, the stability of the dam during the initial impoundment is investigated, and the observation results before and during the second phase of the management period are also introduced.