对存量违法建筑补办手续面临的责任风险研究

来源 :法制与社会 | 被引量 : 0次 | 上传用户:syb9912032
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
地方政府以先上车后补票等优惠政策招商引资产生的存量违法建筑,若补办手续使其合法化,就与地方规章规定的先处罚后补办手续存在矛盾,导致补办手续的规划许可部门面临一定的责任风险。本文认为对此风险应具体问题具体分析,对仅仅是程序违法而无实体违法的违法建筑、超过处罚时效的存量违法建筑、对上级要求先补办手续提出过异议的未超过处罚时效的违法建筑补办手续,规划许可部门无责任;对未超过处罚时效且实体违法、未对上级要求补办手续提出异议而进行补办手续,造成漏处罚的责任,也不能上升到渎职犯罪责任,而仅是一般行政责任。 Local governments to take the car after the first pass and other preferential policies to attract investment in the stock of illegal buildings, if make-up procedures to legalize it with local rules and regulations before the re-submitting procedures there is a contradiction, leading to re-submit the formalities planning permit department faces a certain Liability risk. This article holds that this risk should be specific analysis of specific issues, only the illegal and illegal physical construction of the program, illegal storage over the punishment of the stock of illegal construction, the higher requirements for the first to file an objection to do not exceed the time limit of illegal building re-submit Procedures, the planning permit department no responsibility; for not exceeding the time limit and the entity violates the law, did not request the higher authorities to make re-filing and re-submit the formalities, resulting in leakage of responsibility should not rise to the responsibility of dereliction of duty, but only the general administrative responsibility .
其他文献
矿井通风网络系统是采矿业生产活动的重要组成部分,尤其是煤炭开采业。其系统可靠性关乎企业生产成败、矿工生命及国家财产安全。矿井通风网络可靠性评价经历了由定性向定量
几乎有70%的妇女在经前都有不适反应,如乳房及小腹胀痛、腰痛、头晕、呕吐、浑身不舒服等。现在不少医学家指出,造成这种不适的原因并不只是心理上的因素,而大都是生理上的一
在射频识别系统中,存在阅读器与多个标签同时通信的碰撞问题,多标签识别的防碰撞算法是解决数据冲突的关键。本文分析了RFID多标签防碰撞原理,在此基础上提出了一些提高RFID多标签防碰撞效率的解决方法。
随着通信技术与媒介技术的迅速发展,新媒体时代逐渐拉开帷幕。2018年7月1日起,中国三大通信集团(移动、联通、电信)取消了国内流量漫游费用,提速降费又推出了不限量套餐,这一