一九六五年水文工作要点

来源 :水利水电技术(水文副刊) | 被引量 : 0次 | 上传用户:taobaowang1312
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一九六四年,水文工作取得了一定成績,也有所进步。工作中还存在不少問題,主要是:政治思想工作薄弱,技术比較落后,測报质量不高。 一九六五年要求:以阶級斗爭为綱,以提高測报质量为中心,把各項工作推向前进。要认真执行水利电力部“一九六五年水利水电工作要点”和中共水利电力部政治部“一九六五年政治工 In 1964, some progress was made in hydrological work. There are still many problems in our work. The main ones are: political and ideological work is weak, technology is backward, and the quality of the newspaper is not high. Requirements in 1965: Take class struggle as the key link and improve the quality of journalism as the center, and push forward various tasks. It is necessary to conscientiously implement the “Water conservancy and hydropower major points of 1965” issued by the Ministry of Water Conservancy and Electric Power and the political department of the CPC’s Ministry of Water Resources and Electric Power "1965 Political Workers
其他文献
油、气田中储层厚度和质量的局部变化,会造成井间储层内油气分布位置的不同。在美国现有油藏中还残留有5X10~8bbl原油和450X10~12ff3/d的天然气,这种资源的开发就需要有关的井间
Inrecentyears ,thecatalyticdehydroaroma tizationofmethanetobenzenehasbeenachalleng ingandintriguingresearchsubjectinheterogeneous? Inrecentyears, the catalytic dehydrogenoma tizationofmethanetobenzenehasbeenachalleng ingandintriguingresearchsubjectinhete
期刊
在库鄯( 库尔勒—鄯善) 线上投入生产运行的电动执行器中有87 台是意大利BIFFI公司生产的“QTC”型电动执行器,与它配套的阀门是意大利GROVE公司生产的B5 型与B4D型球阀以及另外4 个口径为1″的小球阀
世界上第一台蒸汽机车和第一条由动力机械牵引的公用铁路诞生至今已近200年,由于机车设计、动力能源、轨道结构等不断改进和发展,车速由每小时20公里提高到200余公里。然而,
对珠江口盆地两口井泥质岩中粘土矿物X衍射分析资料的分段定量研究证实,在渐进成岩过程中,伊蒙混层粘土的伊利石层和蒙皂石层的含量之比(I/S)的加大,与钾长石的溶解有关。有三种形式:若
文中着重论述了饱和土与非饱和土的强度准则及其相应指标,以及这些准则和指标在工程中的应用问题。
利用加信诊断原理,在通过端口比值法完成故障分支定位的基础上,利用传输线的输入阻抗特性推导出短路故障测距公式.该测距公式利用端口的测量值,既可对分支故障点距始端进行测
今春以来,黑龙江省水文总站在狠抓机关革命化和測站革命化工作中,着重抓了“勤俭办站”。几个月以来,取得了一定的效果。茲以旅差費为例,在这方面,我們主要采取了以下几項措
《水利与电力》半月刊是水利电力部的机关刊物。它的主要任务是:高举毛泽东思想红旗,遵循党的社会主义建设总路线,宣传和贯彻党关于水利电力生产建设的方针、政策,传达部的
(本刊讯)7月15日至30日,全国水利设计先进经验交流会议在北京召开。参加会议的有全国28省、区、市水利设计部门,部直属设计院和部分专、县的水利工作者,以及部分水利院校和