论文部分内容阅读
本文是根据参加过龙滩水电站拱坝方案设计咨询工作的法国专家为1987年8月在加拿大召开的国际岩石力学会议所提供的论文编写的。一、研究范围龙滩水电站位于珠江上游的红水河河段上(图1)。该水电站拱坝方案的最大
This article is based on a paper prepared by a French expert who participated in the Design and Consultation of the Dam Project of Longtan Hydropower Station and contributed to the International Conference on Rock Mechanics, held in Canada in August 1987. First, the scope of the study Longtan Hydropower Station is located in the upper reaches of the Pearl River Red River (Figure 1). The largest dam hydropower station program