穆富利拉铜矿目前正在进行一项大型基建工程。该工程系用于开发深部矿体并可将矿山服务年限延长到2000年以后。这项“深部开采”工程的一个主要项目就是开凿一条新的盲副井——穆松博 SV1号井。本文简述了这项工程的全部背景,比较详细地介绍了井筒设计、提升装置与掘井技术。
Mufurillah Copper Mine is currently carrying out a major infrastructural project. The Department of Engineering is used to develop deep ore bodies and extend mine service life beyond 2000. One of the major projects of this “deep extraction” project was the excavation of a new blind auxiliary well, the Musongbo SV1. This article outlines the full background of the project, introducing wellbore design, lifting devices and drilling technology in more detail.