县长前线战洪水

来源 :河南水利 | 被引量 : 0次 | 上传用户:wei_357
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
进入8月,由于受今年8号台风影响,有关省、市受灾的消息不断传来,担任淇县防汛指挥部指挥长的县长孔令晨在百忙之中,时刻关注着全县的防汛工作。8月3日晚8时,淇县突降暴雨,劳累一天刚撂下饭碗的孔县长就冒雨赶到了防汛指挥部办公室,向值班人员了解全县和淇河、卫河、共产主义渠上游市县的雨情、水情,了解防汛重点单位的值班和工程运行情况,并随即带领防指副指挥长葛平然、李国安、 Into August, due to the typhoon on the 8th this year, the impact of the news about the provinces and municipalities continue to come, as the county flood control headquarters commander Kong Lingchen in his busy schedule, always pay attention to the flood control work in the county. 8 o’clock on the August 3, Qi County sudden heavy rain, tired one day just bowed their jobs Kong County Chief arrived at the flood control headquarters office, to the duty staff to understand the county and Qi River, Wei River, communist canal Upstream cities and counties in the rain, water conditions, flood control units to understand the duty and engineering operation, and immediately led the anti-finger deputy commander Ge Pingran, Li Guoan,
其他文献
尽管 ewEEK FastTrack 500家中的大多数公司都说自己已经开展了 B2B 电子商业,但只有那些早在数年前就着手实施的公司收获最大。从事 B2B 电子商务的企业如今终于等到了回报
【本刊讯】2016年11月30日,泉州华光职业学院校长陈雅芳专程前往甘肃省定西市考察商定教育精准扶贫招生合作事宜。在定西市教育帮扶考察座谈会上,陈校长详细介绍了华光学院基
枫树坝水电站位于广东省龙川县境内东江干流上,水库总库容19.4亿m~3,混凝土重力坝高95.3m,空腹式坝内厂房装机2×80MW.其首次大坝定检于1988年完成,结论为正常坝. Maple dam
杨庄滞洪工程是国家计委批准的“八五”治淮重点工程之一。工程自1992年11月18日开工以来,除迁安工程尚待1997年完成外,其余各枢纽工程已于1996年4月18~21日通过了由省水利厅
《人民黄河》为黄河水利委员会主办的综合性水利水电技术月刊,全国水利工程类核心期刊,是一份全面反映治黄科技成果的权威性杂志。开辟的主要栏目有:“防洪·治河”、“水文
岑文,我认识的一位在丝网印刷园地辛勤耕耘了三十多个春秋的拓荒者。他自1990年代开始,致力于网印灯箱这个新兴的领域,拓出一片艳阳天。去年岁末,他以他的得意之作——豪爵
长委召开1996年首次防汛工作会议3月1日,长委召开1996年第一次防汛工作会,传达贯彻全国防办主任会议精神,研究部署今年防汛工作。长江中下游防汛总指挥部副总指挥长黎安田强调,今年要警惕长
江垭工程主体建筑物开始施工据《人民长江报》报道:1996年4月7日,水利部和湖南省共同开发澧水的龙头工程江垭枢纽,由前期工程建设进入主体建筑物施工阶段。水利部部长钮茂生专程来到工
为了推动水利事业的发展,适应国民经济发展的需要,一方面要加强小型水利工程的管理,使其充分发挥效益,一方面要扩大资金投入渠道,建设新的水利工程。汝阳县实行小型水利工程
某制造商为小浪底工程提供设备帕特里克·雷诺兹“小浪底是个很不平常的工程”,在80年代中期,对中国黄河的这座多目标工程进行初步设计时贝奇特尔(Bechtel)说了这番话。世界银行在提出15份报