为减小澧河城区段防洪压力,规划在沙、澧河弯道最近处的大楼魏村附近新开挖一条导洪河道,将澧河洪水提前分流入沙河。文章对工程的可行性及工程建设后可能产生的影响进行了分析,并得出如下结论:漯河市澧河改道提前入沙河工程基本可行;工程建成后对沙、澧河河势整体不会有大的影响,但会造成局部河道岸坡冲刷,建议适当防护。工程实施后可有效改善当地自然、生态和居民生活环境,且在技术、经济和社会等各方面都合理可行,建议尽早付诸实施。
In order to reduce flood control pressure in Bahe River section, it is planned to newly excavate a flood-guiding river channel in the vicinity of Weicun, the building closest to the bend of Bahe and Bahe, and divert Bahe flood ahead of Shahe. The article analyzes the feasibility of the project and the possible impact after the project construction, and draws the following conclusions: Luohe River diversion into the Shahe River project is basically feasible; completion of the project on the sand, Large impact, but will cause local river bank erosion, it is recommended appropriate protection. After the implementation of the project, it can effectively improve the local natural, ecological and residential living environment, and is technically, economically and socially reasonable and feasible, and it is proposed to put it into effect as soon as possible.