摘要:工程建设中的施工管理环节是整个工程项目中比较重要的环节,只有搞好施工建设,才能保证建设项目质量。提高建筑工程质量,多创优质工程,一直是众多施工企业不懈的追求目标。为进一步加强建筑工程质量,切实提高工程施工质量,文中从对影响工程质量的人员、施工工艺、机械工具、材料和环境等几个方面入手,提出了质量管理控制的措施和办法。
关键词:建筑工程;工程质量;施工;控制;
Abstract: The construction management in project construction is an important part of the whole project, only do a good job in construction, in order to ensure the quality of construction project. To improve the quality of construction, to create high-quality project, has been tireless pursuit of the goal of many construction enterprises. In order to further strengthen the construction quality, and effectively improve the construction quality, the paper from several to influence the quality of personnel, construction technology, machine tools, materials and environment and other aspects, and puts forward some measures and methods of quality management and control.
Keywords: construction engineering; construction quality; construction; control
中图分类号:TU71
随着我国经济建设的发展,二线城市快速往一线城市建设发展靠齐。在城市建设过程中,建设的项目越来越大,而业主的资金投入越来越多,对于小型建设施工项目的管理,我们完全可以选择良好素质的施工队伍进行施工建设,但是对于目前建设项目的状况, 我们只能通过完善管理,在施工过程中,依靠标准化的施工流程,科学的管理观念,人性化的体制结构对整个项目进行跟进管理,才能够保证项目能够顺利的完成。
1 工程施工中质量管理的重要性
工程项目施工涉及面广,是一个极其复杂的过程,影响质量的因素很多,如设计、材料、机械、地形、地质、水文、气象、施工工艺、操作方法、技术措施、管理制度等,均直接影響着工程项目的施工质量;而且工程项目位置固定、体积大,不同项目地点不同,不象工业生产有固定的流水线、规范化生产工艺及检测技术、成套的生产设备和稳定的生产条件,因此影响施工项目质量的因素多,容易产生质量问题。 如使用材料的微小差异、操作的微小变化、环境的微小波动,机械设备的正常磨损,都会产生质量变异,造成质量事故。工程项目建成后,如发现质量问题又不可能象一些工业产品那样拆卸、解体、更换配件,更不能实行 “包换”或“退款”,因此工程项目施工过程中的质量控制,就显得极其重要。
2 严格施工材料构配件质量控制施工材料构配件质量的优劣与施工工程实体质量的优劣息息相关。要实现建筑工程质量达标创优的目标,施工企业的施工材料供应部门必须与施工材料构配件厂家建立工作联系和材料质量信息反馈系统。密切业务联系,不断改进和提高材料质量,避免和解决与供方的质量争端。笔者认为:施工材料构配件质量控制的关键要抓住施工材料构配件采购质量、施工材料构配件质量验收、施工材料构配件贮存质量这三个环节。
2.1 施工材料构配件采购质量。物质采购人员要选择合格的供方。应初拟 2 家以上供应方待选,经过比较后确定,对经过几次供货考核,确能保证供货质量的供地可签定长期供货协议,同时,还要考虑施工材料构配件价格和费用,交付服务等标准来评价供应厂家。设计部门和建设单位指定的供应材料构配件厂家,经审核确有质量保证能力,可按设计和建设部门指定的厂家订货。否则,应同设计和建设部门协商,另择供方。做到四不采购,即不采购达不到质量标准的材料构配件;不采购国家已明确淘汰的材料构配件,不采购不带合格的材料构配件,不采购需用单位已对质量提出异议的材料。
2.2 施工供应材料构配件的质量验收是施工材料构配件质量控制的重要环节。在材料构配件供应验收过程中,对材料构配件质量有异议时,供应部门负责同供料单位交涉,具体实施按《原材料构配件质量异议仲裁办法》处理。材料构配件质量复检后要索取复检报告,对复检不合格的施工材料构配件要按《材料构配件隔离办法》、《原材料构配件退货办法》处理。
2.3 施工材料构配件贮存的质量管理。为使库存的施工材料构配件不发生变质,保证物质的完好无损,供应部门及分公司或项目经理部的仓库管理人员负责验收入库材料构配件保管和发放。必须严格按照仓库管理办法,及时上帐上架,严格执行仓库保管原则。特殊材料跟踪管理,按照类别分类保管,严禁混料。开展经常性的对库存物质材料构配件进行检查,以发现可能发生的质量变化和损失情况,防止发生物质材料霉烂、变质、潮湿、锈蚀、虫鼠害、老化和过期失效。工程项目的施工过程,是由一系列相互关联,相互制约的工序所构成,工序质量是基础,直接影响工程项目的整体质量。工序质量的控制,就是对工序活动条件的质量控制和工序活动效果的质量控制,据此来达到整个施工过程的质量控制。工序质量控制的原理是采取数理统计方法,通过对工序一部分(子样)检验的数据,进行统计、分析,来判断整道工序的质量是否稳定、正常。若不稳定,产生异常情况,必须及时采取对策和措施予以改进。在对工序质量控制过程中,一是严格执行施工工艺和操作规程。二是突出对施工人员、施工材料、施工机械设备、施工方法和施工环境等因素实行有效控制,使其处于受控制状态。三是及时检验工序活动效果质量,及时掌握质量动态。四是设置工序质量控制点。对工序关键部位或薄弱环节,用设置工序质量控制点的办法来保证工序,使之达到良好控制状态。
3 工程建设质量管理
项目管理的过程是工程进度管理、质量管理、成本管理的过程,这3者之间存在着紧密的关系,工程进度过长,势必会造成成本的提高,而工程进度太短,可以降低生产成本,但是会影响到施工项目的质量。如何能够在不影响工程进度的情况下,有效的提升工程建设的质量是我们应该考虑的问题。
3.1 作为管理者应该了解工程的概况是保证工程建设质量的前提条件,在项目初期,应该研究并且熟悉施工图纸、项目相关的技术规范、项目的设计要求以及其内部细节。熟悉各个项目模块的质量达标参数以及研究其实施方案。掌握施工建设中的重点环节与薄弱环节,有必要的亲自到施工现场去实地勘察,了解情况,这样才能够更好的落实施工管理,为建设工程项目的质量管理打好基础工作。
3.2 做好施工准备工作后,在施工前,应该向施工人员交代好施工的任务和施工方法,并且为实现施工目标而创造良好的施工条件。在实施过程中应该严格把握好质量关,严格按照施工图纸、技术方案进行施工,并且在进度和成本之间作好平衡工作。 3.3 强化组织管理,及时了解施工员工的具体情况,并且在实施过程中培养其集体主义思想,有计划有目的的开展早会工作,在早会上及时解决当天发生的问题,以及预防未来可能存在的风险问题。
4严把施工技术关,控制工程质量水平施工质量控制,与技术因素息息相关。技术因素除了人员的技术素质外,还包括装备、信息、检验和检测技术等。国家建设部《技术政策》中指出:“要树立建筑产品观念,各个环节要重视建筑最终产品的质量和功能的改进,通过技术进步,实现产品和施工工艺的更新换代”。这句话阐明了新技术、新工艺和质量的关系。科技是第一生产力,体现了施工生产活动的全过程。技术进步的作用,最终体现在产品质量上。为了工程质量,应重视新技术、新工艺的先进性、适用性。在施工的全过程,要建立符合技术要求的工艺流程、质量标准、操作规程、建立严格的考核制度,不断地改进和提高施工技术和工艺水平,确保工程质量。
质量控制的目标管理应抓住目标制定,目标展开和目标实现三个环节。施工质量目标的制订,应根据企业的质量目标及控制中没有解决的问题、没有经验的新施工产品、以及用户的意见和特殊的要求等,其中同类工程质量通病是最主要的质量控制目标;目标展开就是目标的分解与落实;目标的实施,中心环节是落实目标责任和实施目标责任。各专业、各工序都应以质量控制为中心进行全方位管理,从各个侧面发挥对工程质量的保证作用。从而使工程质量控制目标得以实现。
施工过程中的方法包含整个建设周期内所采取的技术方案、工艺流程、组织措施、检测手段、施工组织设计等。施工方案正确与否,直接影响工程质量控制能引顺利实现。往往由于施工方案考慮不周而拖延进度,影响质量,增加投资。为此,制定和审核施工方案时,必须结合工程实际,从技术、管理、工艺、组织、操作、经济等方面进行全面分析、综合考虑,力求方案技术可行、经济合理、工艺先进、措施得力、操作方便,有利于提高质量、加快进度、降低成本“百年大计,质量策一”。工程施工项目管理中,我们要站在企业生存与发展的高度来认识工程质量的重大意义,坚持“以质取胜”的经营战略,科学管理,规范施工,以此推动企业拓宽市场,赢得市场,谋求更大发展。
5 结束语
总之,建设项目工程是一个工程建设从始到终的系统工程,在这个系统工程中,只有认真负责、严格把握好系统工程中的每一个阶段,以及工程落实的具体细节,才能够正在做好工程建设项目的质量管理。
关键词:建筑工程;工程质量;施工;控制;
Abstract: The construction management in project construction is an important part of the whole project, only do a good job in construction, in order to ensure the quality of construction project. To improve the quality of construction, to create high-quality project, has been tireless pursuit of the goal of many construction enterprises. In order to further strengthen the construction quality, and effectively improve the construction quality, the paper from several to influence the quality of personnel, construction technology, machine tools, materials and environment and other aspects, and puts forward some measures and methods of quality management and control.
Keywords: construction engineering; construction quality; construction; control
中图分类号:TU71
随着我国经济建设的发展,二线城市快速往一线城市建设发展靠齐。在城市建设过程中,建设的项目越来越大,而业主的资金投入越来越多,对于小型建设施工项目的管理,我们完全可以选择良好素质的施工队伍进行施工建设,但是对于目前建设项目的状况, 我们只能通过完善管理,在施工过程中,依靠标准化的施工流程,科学的管理观念,人性化的体制结构对整个项目进行跟进管理,才能够保证项目能够顺利的完成。
1 工程施工中质量管理的重要性
工程项目施工涉及面广,是一个极其复杂的过程,影响质量的因素很多,如设计、材料、机械、地形、地质、水文、气象、施工工艺、操作方法、技术措施、管理制度等,均直接影響着工程项目的施工质量;而且工程项目位置固定、体积大,不同项目地点不同,不象工业生产有固定的流水线、规范化生产工艺及检测技术、成套的生产设备和稳定的生产条件,因此影响施工项目质量的因素多,容易产生质量问题。 如使用材料的微小差异、操作的微小变化、环境的微小波动,机械设备的正常磨损,都会产生质量变异,造成质量事故。工程项目建成后,如发现质量问题又不可能象一些工业产品那样拆卸、解体、更换配件,更不能实行 “包换”或“退款”,因此工程项目施工过程中的质量控制,就显得极其重要。
2 严格施工材料构配件质量控制施工材料构配件质量的优劣与施工工程实体质量的优劣息息相关。要实现建筑工程质量达标创优的目标,施工企业的施工材料供应部门必须与施工材料构配件厂家建立工作联系和材料质量信息反馈系统。密切业务联系,不断改进和提高材料质量,避免和解决与供方的质量争端。笔者认为:施工材料构配件质量控制的关键要抓住施工材料构配件采购质量、施工材料构配件质量验收、施工材料构配件贮存质量这三个环节。
2.1 施工材料构配件采购质量。物质采购人员要选择合格的供方。应初拟 2 家以上供应方待选,经过比较后确定,对经过几次供货考核,确能保证供货质量的供地可签定长期供货协议,同时,还要考虑施工材料构配件价格和费用,交付服务等标准来评价供应厂家。设计部门和建设单位指定的供应材料构配件厂家,经审核确有质量保证能力,可按设计和建设部门指定的厂家订货。否则,应同设计和建设部门协商,另择供方。做到四不采购,即不采购达不到质量标准的材料构配件;不采购国家已明确淘汰的材料构配件,不采购不带合格的材料构配件,不采购需用单位已对质量提出异议的材料。
2.2 施工供应材料构配件的质量验收是施工材料构配件质量控制的重要环节。在材料构配件供应验收过程中,对材料构配件质量有异议时,供应部门负责同供料单位交涉,具体实施按《原材料构配件质量异议仲裁办法》处理。材料构配件质量复检后要索取复检报告,对复检不合格的施工材料构配件要按《材料构配件隔离办法》、《原材料构配件退货办法》处理。
2.3 施工材料构配件贮存的质量管理。为使库存的施工材料构配件不发生变质,保证物质的完好无损,供应部门及分公司或项目经理部的仓库管理人员负责验收入库材料构配件保管和发放。必须严格按照仓库管理办法,及时上帐上架,严格执行仓库保管原则。特殊材料跟踪管理,按照类别分类保管,严禁混料。开展经常性的对库存物质材料构配件进行检查,以发现可能发生的质量变化和损失情况,防止发生物质材料霉烂、变质、潮湿、锈蚀、虫鼠害、老化和过期失效。工程项目的施工过程,是由一系列相互关联,相互制约的工序所构成,工序质量是基础,直接影响工程项目的整体质量。工序质量的控制,就是对工序活动条件的质量控制和工序活动效果的质量控制,据此来达到整个施工过程的质量控制。工序质量控制的原理是采取数理统计方法,通过对工序一部分(子样)检验的数据,进行统计、分析,来判断整道工序的质量是否稳定、正常。若不稳定,产生异常情况,必须及时采取对策和措施予以改进。在对工序质量控制过程中,一是严格执行施工工艺和操作规程。二是突出对施工人员、施工材料、施工机械设备、施工方法和施工环境等因素实行有效控制,使其处于受控制状态。三是及时检验工序活动效果质量,及时掌握质量动态。四是设置工序质量控制点。对工序关键部位或薄弱环节,用设置工序质量控制点的办法来保证工序,使之达到良好控制状态。
3 工程建设质量管理
项目管理的过程是工程进度管理、质量管理、成本管理的过程,这3者之间存在着紧密的关系,工程进度过长,势必会造成成本的提高,而工程进度太短,可以降低生产成本,但是会影响到施工项目的质量。如何能够在不影响工程进度的情况下,有效的提升工程建设的质量是我们应该考虑的问题。
3.1 作为管理者应该了解工程的概况是保证工程建设质量的前提条件,在项目初期,应该研究并且熟悉施工图纸、项目相关的技术规范、项目的设计要求以及其内部细节。熟悉各个项目模块的质量达标参数以及研究其实施方案。掌握施工建设中的重点环节与薄弱环节,有必要的亲自到施工现场去实地勘察,了解情况,这样才能够更好的落实施工管理,为建设工程项目的质量管理打好基础工作。
3.2 做好施工准备工作后,在施工前,应该向施工人员交代好施工的任务和施工方法,并且为实现施工目标而创造良好的施工条件。在实施过程中应该严格把握好质量关,严格按照施工图纸、技术方案进行施工,并且在进度和成本之间作好平衡工作。 3.3 强化组织管理,及时了解施工员工的具体情况,并且在实施过程中培养其集体主义思想,有计划有目的的开展早会工作,在早会上及时解决当天发生的问题,以及预防未来可能存在的风险问题。
4严把施工技术关,控制工程质量水平施工质量控制,与技术因素息息相关。技术因素除了人员的技术素质外,还包括装备、信息、检验和检测技术等。国家建设部《技术政策》中指出:“要树立建筑产品观念,各个环节要重视建筑最终产品的质量和功能的改进,通过技术进步,实现产品和施工工艺的更新换代”。这句话阐明了新技术、新工艺和质量的关系。科技是第一生产力,体现了施工生产活动的全过程。技术进步的作用,最终体现在产品质量上。为了工程质量,应重视新技术、新工艺的先进性、适用性。在施工的全过程,要建立符合技术要求的工艺流程、质量标准、操作规程、建立严格的考核制度,不断地改进和提高施工技术和工艺水平,确保工程质量。
质量控制的目标管理应抓住目标制定,目标展开和目标实现三个环节。施工质量目标的制订,应根据企业的质量目标及控制中没有解决的问题、没有经验的新施工产品、以及用户的意见和特殊的要求等,其中同类工程质量通病是最主要的质量控制目标;目标展开就是目标的分解与落实;目标的实施,中心环节是落实目标责任和实施目标责任。各专业、各工序都应以质量控制为中心进行全方位管理,从各个侧面发挥对工程质量的保证作用。从而使工程质量控制目标得以实现。
施工过程中的方法包含整个建设周期内所采取的技术方案、工艺流程、组织措施、检测手段、施工组织设计等。施工方案正确与否,直接影响工程质量控制能引顺利实现。往往由于施工方案考慮不周而拖延进度,影响质量,增加投资。为此,制定和审核施工方案时,必须结合工程实际,从技术、管理、工艺、组织、操作、经济等方面进行全面分析、综合考虑,力求方案技术可行、经济合理、工艺先进、措施得力、操作方便,有利于提高质量、加快进度、降低成本“百年大计,质量策一”。工程施工项目管理中,我们要站在企业生存与发展的高度来认识工程质量的重大意义,坚持“以质取胜”的经营战略,科学管理,规范施工,以此推动企业拓宽市场,赢得市场,谋求更大发展。
5 结束语
总之,建设项目工程是一个工程建设从始到终的系统工程,在这个系统工程中,只有认真负责、严格把握好系统工程中的每一个阶段,以及工程落实的具体细节,才能够正在做好工程建设项目的质量管理。