用置换法浇筑塑性防渗墙

来源 :水力发电 | 被引量 : 0次 | 上传用户:Aegean1218
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
近年来,国外运用防渗墙的菹围正在扩大,其施工方法也不断得到改进。最初的防渗墙,是用混凝土或水泥砂浆作材料制成的刚性防渗墙,它在外力作用下容易产生裂缝,一旦发生渗漏,要修复几乎不可能,同时要防止防渗墙联接部份漏水也很困难。因此,近来国外都在发展用土(或土与水泥混合)作防渗材料的塑性墙。这种塑性防渗墙不易裂,且成本低,因而很快在世界上被推广使用。关于防渗墙的施工方法,目前国外采用最多的是 In recent years, the use of impervious walls abroad is expanding and its construction methods are continuously being improved. The initial cut-off wall is a rigid cut-off wall made of concrete or cement mortar. It is prone to crack under the action of external force. In the event of seepage, it is almost impossible to repair it. At the same time, the cut-off wall joint It is also very difficult to leak water. Therefore, plastic walls that use soil (or a mixture of soil and cement) as impervious materials have recently been developed abroad. This plastic cut-off wall is not fragile, and the cost is low, so it is quickly being used in the world. About cut-off wall construction methods, currently used most is
其他文献
大化水电站是红水河梯级开发的第一期工程,于1973年开始勘测,1974年选坝,1975年5~9月完成了初步设计的审查和批准,10月正式开工。该电站位于广西都安和马山县交界的红水河上,
本院自1995年~1997年开展了小儿脑瘫高选择性脊髓神经根切断术(简称SPR术),由于该手术难度大,时间长,因此麻醉方法的选择至关重要,笔者根据小儿脑瘫和SPR术的特点选用了禁用
采用双抗体夹心ELISA法和放射免疫法观察了67例不同类型的支气管哮喘,30例支原体肺炎及30例呼吸道合胞病毒(RSV)肺炎患儿的可溶性细胞间粘附分子(sICAM-1)和总IgE水平,并与30
乌魯木齐河灌区位于天山北麓,引蓄乌魯木齐河水灌溉,是新疆維吾尔自治区大型灌区之一。解放十四年来,乌魯木齐河流域进行了大規模的水利建設,全河灌区已形成了一个比较完整
为了促进我国河流泥沙科技工作的发展,经国务院批准,由中国水利学会与国际水文计划中国国家委员会共同组织,定于一九八三年十月在南京召开第二届河流泥沙国际学术讨论会。会
前言太平哨水电站,是浑江上继桓仁、回龙山之后建成发电的第三个梯级水电站。该电站装机容量为4×4.025万千瓦,枢纽为混合式布置,由混凝土坝、隧洞引水系统和地面厂房组成。
在工程地质勘察中运用先进的方法,是降低水电站设计和施工造价的途径之一。即使部分地利用地球物理勘探法代替昂贵的钻探,也能大大降低勘察工作 The use of advanced metho
全国水工建筑物抗冻技术情报网是在1975年8月成立的,参加技术情报网的单位目前有四十五个。经网的各成员单位民主协商推荐,由黑龙江省水利勘测设计院任网长单位,水利电力部
长江河道比较稳定,几千年来大体上走着一条变化不大的老路。这在长江文物考古中已有相当充分的论证。为了了解长江河道的变迁,中国科学院地理研究所等单位几年前曾在城陵矶
三、防冻 閘坝工程除了防凌和防冰压以外,还有防冻問題。淮河下游有座水閘的閘門支臂,因冻結在关閉閘門时損坏。华北地区有一水閘也因閘門与門槽冻結,在开启时,使若干孔启閉