江苏徐塘发电有限责任公司现有4台30万千瓦机组,分别为一期2×30万千瓦技改工程和二期2×30万千瓦扩建工程,两期工程分别于2002年和2005年底建成投产发电,4台机组锅炉水压、汽机扣缸、带厂用电、点火、冲转、并网发电均一次成功,整套试运期间燃油量、轴振、瓦振等各项指标均为
Jiangsu Xu Tong Power Generation Co., Ltd. currently has 4 units of 300,000 kilowatts generating units, respectively, a 2 × 300,000 kilowatts technical transformation project and two 2 × 300,000 kilowatts expansion project, two were completed in 2002 and the end of 2005 Commissioning and power generation, 4 units of boiler pressure, steam cylinder buckle, with the plant electricity, ignition, Chongzhuan, power grid were a success, the entire trial during the fuel quantity, shaft vibration, tile vibration and other indicators are