论文部分内容阅读
本文分析了工程量清单计价模式下不平衡报价存在的根源及其影响,提出通过提高施工图的设计质量、确保工程量清单的质量、制定制约不平衡报价评标方法、科学签订施工合同、施工阶段严格控制工程变更等方法,应对不平衡报价。
This paper analyzes the root causes of the unbalance quotation under the BOQ pricing model and its influence. It proposes that by improving the design quality of the construction drawing, ensuring the quality of the BOQ, formulating the evaluation method for unbalanced quotation, scientifically signing the construction contract and construction Stage strict control of engineering changes and other methods to deal with the imbalance in quotes.