在水利水电工程建设中,一般机械化施工程度都较高。因此,施工设备购制费大体占工程造价的10%~20%,基至更高,故对设备小时费用的计算方法和费用构成,建设各方都甚为关切。据了解,近期我国水利水电施工企业走出国门,参与竞争,承包国外工程总金额达上亿美元;引进外资建设水电水利项目也有几十亿美元;同时,我国水电水利工程造价改革方向也正与国际通用方法接轨。陈汉文同志介绍的国外施工设备小时费用计算一文,收集了不少资料,并进行了分析研究,列举了示例,可供概(估)算时研究参考。
In the construction of water conservancy and hydropower projects, the general degree of mechanized construction are higher. Therefore, the purchase cost of construction equipment accounts for about 10% ~ 20% of the construction cost, and the basis is higher. Therefore, it is very concerned about the calculation method and cost composition of equipment hourly cost and all parties involved in construction. It is understood that China’s water conservancy and hydropower construction enterprises have recently gone abroad to participate in the competition and have contracted foreign projects amounting to hundreds of millions of U.S. dollars. There are also billions of dollars of hydropower projects imported from foreign countries. At the same time, the reform direction of China’s hydropower and water conservancy projects is also in the process of international cooperation. Common methods of convergence. Comrade Chen Hanwen describes the cost of construction equipment abroad a text calculation, collected a lot of information, and conducted an analysis of research, citing examples for the (estimated) when the study reference.