论文部分内容阅读
《共青团员》矿井管理处用一条输送机线将一号破碎-选矿厂两个车间加工石灰岩的尾矿运往废石场。这条输送机线由11台输送机组成,全长3010米。该输送机线的输送能力:两个车间同时生产时为500吨/小时;一个车间单独生产时为250吨/小时。
The “Communist Youth League” mine management department used a conveyor line to crush the No. 1 limestone tailings from the two workshops of the concentrator to the waste rock yard. This conveyor line consists of 11 conveyors, a total length of 3010 meters. Conveyor line capacity: 500 tons / hour for two workshops and 250 tons / hour for a single workshop.