英国水工试验研究站(Hydraulics Research Station)正进行泰晤士河口外马普林浅滩/福尔内斯海港与航空港(Maplinsands/Fouliless Seaport-airport)填筑工程的模型试验,据称该项填筑工程的实现可能性是没有问题的,模型试验的目的只在于表明哪种填筑样式最经济,最有利。环境局主张1974年即开始填筑。但尚有不少待解决的问题。一些工程师认为填筑计划并不是已经证明现实可行,他们感觉到淤积试验的结果可能是不可靠的。模型范围包括费利克斯托(Felixtowe)、泰晤士河口自伍尔威奇河区至马加特
Hydraulics Research Station is carrying out a model test of the filling of the Thames Estuary Maprinsands / Fouliless Seaport-airport, There is no problem with the possibility of realization, and the purpose of the model test is only to show which filling pattern is the most economical and most advantageous. The Environment Agency advocates that construction begin in 1974. But there are still many problems to be solved. Some engineers do not think landfilling plans have proved viable and they feel the result of siltation tests may not be reliable. The model range includes Felixtowe, the mouth of the Thames from the Woolwich River area to Magath