论文部分内容阅读
虎门大桥的主航道桥是跨径888m的悬索桥,全桥于1997年5月1日试通车。我们悬索桥工程公司是主航道桥的施工单位。本公司参照国外资料,在大跨悬索桥施工质量管理方面积累一些经验。主要做法是:设置质检机构,完善质检制度;多层次培训,提高全员质量意识;加强试验工作,保证材料和中间成品质量;研制新设备,保持所有设备的完好率;借鉴国外技术,不断改进工艺;做好技术交流,加强现场检查;严格质量标准,完善原始记录;及时解决每个质量问题,努力创建优质工程。
Humen Bridge main waterway bridge is a span of 888m suspension bridge, the full bridge on May 1, 1997 opened to traffic. Our suspension bridge engineering company is the main waterway bridge construction unit. The Company with reference to foreign information, in the construction of large-span suspension bridge construction quality management has accumulated some experience. The main approach is: set up quality inspection agencies, improve the quality inspection system; multi-level training to improve the quality awareness of all staff; strengthen the testing work to ensure the quality of materials and intermediate products; develop new equipment to maintain the good rate of all equipment; learn from foreign technology, Continuous improvement of technology; good technical exchanges, strengthen on-site inspection; strict quality standards, improve the original records; timely solution to each quality problem, and strive to create quality projects.