Geological uncertainty and risk: implications for the viability of mining projects

来源 :煤炭学报(英文版) | 被引量 : 0次 | 上传用户:lin840827247
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Computerized geological models are the basis of modem mine design, planning and production. A sound, validated geological model is essential to the success of a mining project. However, due to the complexity of geology surrounding deposits, geological models inherit uncertainty, or error. This geological uncertainty may significantly affect the risk profile of a mining project during its design and operational phases. Methodologies for quantifying geological uncertainty and risk have been developed by CRC Mining and the University of Queensland, Australia and successfully applied to case studies. This paper discussed the implications of geological uncertainty and risk to a coal mining project, and presents advances for quantifying geological/geotechnical uncertainty and risk. A case study is presented to demonstrate the application of the technology developed.
其他文献
Roof bolt support system has been widely applied in the No.7.9 seam in Caozhuang coal mine.However,it has not been able to be applied in the NO.10-2 seam since the small interburden(2m)between NO.9 and NO.10-2 seam.The NO.9 and NO.10-2 seams are contiguou
Patterns of shear band, precursors to shear failure occurring in strain-softening stage, axial, lateral and volumetric strains as well as Poisson\'s ratio of plane strain rock specimens in compression for different heights were investigated by use of Fa
High performance metakaolinite based cementitious materials were prepared with metakaolinite as main component, and the different modules of Na and Na-K silicate solutions as diagenetic agent. The results show that the mechanical properties are affected b
It is very important for secure mining under water bodies to study the effects of Iongwall mining on the underground water. In order to study this problem, piezometers for monitoring underground water levels were established in an American coalmine. Large
An active measurement method and its principle was introduced considering the low success rate, special difficulty, and long measurement time of the direct gas pres-sure measurement currently used in coal roadways. The technology of drilling, borehole sea
Using coal tar pitch as a matrix precursor to prepare carbon materials is widely used by impregnation/carbonization processing technology. Four different grades of coal tar pitch and a natural pitch were characterized in terms of carbon yield, density, vi
There are many problems in terms of safe coal production and the sound de-velopment of the coal industry. Accompanying the intensification and increasing efficiency of coal production and the conducting of mining operations at deeper and more remote areas
On the basis of investigation and research on the pollution source and pollution pathway of Yujiagou area, by the ground water quality analysis and the leaching and soaking experiments of the gangue, reliable data were obtained. The experiment results pro
A new method for predicting the trend of displacement evolution of surrounding rock was presented in this paper. According to the nonlinear characteristics of displacement time series of underground engineering surrounding rock, based on phase space recon