一、基本情况: 山西省册田水库水轮泵站,是为解决水库左岸海拔1125米高程以下四个公社四十个生产大队丘陵干旱地区发展水地,解决社队人畜吃水,兴建的一座引、蓄、提灌溉(兼顾发电)工程,工程规划分二期建设,一期工程完成主体骨干工程,发电工程及部份灌区配套工程,配套灌溉面积5.17万亩,年发电量600万度;二期工程完成提水旁引蓄水水库及遗留配套工程,发展水浇地4.03万亩。目前,一期工程基本完成,受益面积达4.0万亩,年发电量500—600万度。
First, the basic situation: Shanxi Province, Cotin reservoir water pump station, is to solve the left bank of 1125 meters above sea level four communes 40 production units in hilly arid areas to develop water to solve the social team draft, build a lead , Storage and irrigation (taking into account the power generation) project, construction planning in two phases, the first phase of the project to complete the backbone of the project, power generation projects and some irrigation projects supporting irrigation area of 51,700 mu, annual generating capacity of 6,000,000 degrees; Completion of the project to mention the introduction of water storage reservoirs and legacy projects, the development of irrigated 4.03 acres. At present, the first phase of the project is basically completed, benefiting an area of 40,000 mu and annual generating capacity of 500-600 million degrees.