受贵州省发展和改革委员会的委托,水电水利规划设计总院组织有关部门和单位开展乌江东风水电站扩机工程专项验收工作。根据验收工作安排,水电总院组织验收专家组于2016年8月29日一30日开展了枢纽工程专项验收前现场检查及验收资料预评审工作。验收专家组检查了工程现场,听取了工程建设、运行、设计、安全监测等单位的汇报,对枢纽工程建设和初期运行中存在的主要问题进行了讨论和研究,提出了验收专家组现场检查意见。2016年10月15日~16日,验收专家组在查阅验收资料的基础上对枢纽工程专项验收条件进行了评审,形成了验收专
Entrusted by the Development and Reform Commission of Guizhou Province, the Hydropower & Water Resources Planning and Design Institute organizes relevant departments and units to carry out special inspection of the expansion project of Wujiang Dongfeng Hydropower Station. According to the acceptance work arrangements, the acceptance and expert panel organized by the General Hospital of Hydropower carried out pre-accreditation of on-site inspection and acceptance data before acceptance of the special hub project on August 29, 2016 and January 30, The inspection team checked the project site, listened to the reports of the project construction, operation, design and safety monitoring, discussed and studied the major problems in the construction and initial operation of the hub project, and put forward the opinions of the inspection team on site . October 15, 2016 to 16, acceptance of the inspection team on the basis of inspection and acceptance of materials on the project acceptance of special conditions were reviewed to form a special inspection