三峡电站机组单机容量大、装机台数多,由于机组的辅助系统复杂,对厂用电的依赖性强,一旦厂用电中断或发生扰动,都会引起机组辅助系统工作异常,进而影响主机的运行。同时,因三峡工程建设周期长,投产初期未形成完整的厂用电系统,厂用电本身的可靠性较低,发生了多起因厂用电的原因造成机组跳闸、停机的事件。通过改进完善机组辅助设备电源和控制回路、增加机组出口开关以提高机组自供电源的灵活性、增设三峡电站自备保安电源电站、完善厂用电网络等措施,极大地提高了厂用电和机组运行的可靠性。
Due to the complexity of the auxiliary system of the unit and the strong dependence on the power consumption of the plant, the interruption of the power supply or the disturbance of the power plant will cause abnormal work of the auxiliary system of the unit, which will affect the operation of the host. In the meantime, due to the long construction period of the Three Gorges Project and the fact that no complete plant power supply system has been formed at the early stage of production, the reliability of the power plant itself is relatively low, causing multiple trips and shutdowns of the power generating units. By improving and perfecting unit auxiliary equipment power and control loop, increasing unit outlet switch to improve the flexibility of unit self-power supply, adding three gorges power station-owned security power station, improve the plant electricity network and other measures to greatly improve the power plant and unit Operational reliability.