文章以秦皇岛某一水厂为实例,该水厂在更改水源之后,在水厂处理原水的性质发生了很大的改变,进而导致原始的矾剂投放系统已经难以切实地符合新的水源性质处理要求,加之原始的投放系统在使用年份上已经很久,存在诸多的问题,因此进行系统改造是必要之举。在此背景下,首先介绍了原水厂投加系统之中存在的问题,进而分析了水厂矾剂投加系统技术改造措施,最后简要介绍了水厂矾剂投加系统技术改造工程效果。
Taking a water plant in Qinhuangdao as an example, the nature of the raw water treated in the water plant changed greatly after the water plant changed its water quality. As a result, the original alum injection system has been difficult to effectively meet the new water quality treatment Requirements, coupled with the original delivery system has been in use for a long time, there are many problems, so the system is necessary to upgrade. Under this background, the problems existing in the dosing system of the raw water plant are introduced firstly, and then the technical reformation measures of the dosing system of the alum dosing plant in the water plant are analyzed. Finally, the technical reformation project results of the dosing system of the alum dosing plant in the water plant are briefly introduced.