论文部分内容阅读
四、低湿介质热养护混凝土孔结构的变化在低湿介质养护过程中,随着混凝土部分自由水分的蒸发及微管压力的增大,混凝土微管多孔结构的形成过程及其孔结
Fourth, changes in the pore structure of the low-humidity medium thermal curing concrete In the process of low-humidity medium curing, with the evaporation of the free moisture of the concrete and the increase of the micro-pipe pressure, the formation process of the porous structure of the concrete micro-pipes and their pores