论文部分内容阅读
本文根据《高层民用建筑设计防火规范》GB50045-95、《火灾自动报警系统设计规范》GB50116-98等设计规范的要求,针对工程设计中对联动控制系统规范执行过程中存在的几个问题,进行深入研究探讨,并结合实际工程设计实例提出应采用的联动/手动直接控制方法。
According to the requirements of “Code for Fire Protection Design of High-Rise Civil Buildings” GB50045-95 and “Code for Design of Automatic Fire Alarm System” GB50116-98, etc., according to some problems existing in the process of standardization of linkage control system in engineering design, In-depth study and discussion, combined with actual engineering design examples proposed linkage / manual direct control method.