化工部第三化工建设公司是承担化工、石油建设的专业施工企业。1979年以来,由于基建下马,施工任务不足,出现窝工的威胁。面对这种情况,他们积极主动地广开生产门路,取得了良好的效果,做到了基建下马不窝工。1979年完成工作量2,653万元,其中找米下锅的932万元,占完成工作量的35%,实现利润76万元;1980年完
The third chemical construction company of the Ministry of Chemical Industry is a professional construction company undertaking chemical and petroleum construction. Since 1979, due to infrastructure construction and inadequate construction tasks, there has been a threat of work. Faced with this situation, they actively opened up their production roads and achieved good results. They did not dispose of the infrastructure. In 1979, the amount of work completed was 25.653 million yuan, of which 9.32 million yuan was found in the rice pot, which accounted for 35% of the completed workload, and realized a profit of 760,000 yuan; it was completed in 1980.